Water and Wastewater solution provider
आपो हिष्ठा मयोभुवस्था न ऊर्जे दधातन । महे रणाथ चक्षसे ॥१॥
यो वः शिवतमो रसस्तस्य भाजयतेह नः । उशतीरिव मातरः ॥२॥
O Water, you are refreshing, source of energy, health and piety.
Nourish us with your auspicious sap as mother.
(Rig Veda, Mandala 10, Sukta 9)
Services
Total Service provider from Concept to Commissioning of following Services
Waste Water Treatment Plant
Water Treatment Plant
Water Network modelling
Waste Water and water audit BOQ
Long Distance Piping system design
GIS & Mapping Work
Features
Different projects require different technologies. Pick a plan that matches your current needs.
What we do
- Water treatment plant Design.
- Waste water treatment plant design.
- Water distribution network model building.
- Long distance piping system design (Surge analysis).
- GIS & Mapping works.
- Creation of district metered areas.
- Water Audit.
- Energy Audit.
- Economic and life cycle analysis of a pipeline network.
- Environmental Impact analysis.
- Cost Benefit Analysis of the Project.
- Estimation and BOQ.
- Tender document preparation.
water360
Our Clients
Water360 has completed more than 100 projects around the globe since it formed.
water360
Projects
Water 360 provide concepts to commisioning of water supply projects include technical services in analyzing and designing of pipelines for long distance transmission main for Water and Waste Water system
Projects Details 2022-2023
Pasakha,Bhutan
Supply, Erection/Installation, Manufacture & Construction and Finishing of 1200 bedded fully self-contained permanent Quarantine Centre at Pasakha Bhutan.
Matanga, Bhutan
Supply, Erection/Installation, Manufacture & Construction and Finishing of 1000 bedded fully self-contained permanent Quarantine Centre at Matanga,Bhutan.
Motanga,Jonkhar
Supply, Erection/Installation, Manufacture & Construction and Finishing of 1000 bedded fully self-contained permanent Quarantine Centre at Motanga,Sandrup Jonkhar.
River Kaveri
Engineering, Procurement And Construction (EPC) Work For Construction of Vaghrech Weir, Flood Protection Embankments And Assoc Works, Across River Kaveri
Kanglung
Design Engineering, Supervision and Execution of 3.2 MLD Water Treatment Plant for Kanglung Regional Hub, Dzongkhag, Royal Govt. of Bhutan
Gyelposing, Bhutan
Detailed Engineering Services for Construction of 1.0 MLD WTP Water Treatment Plant for at Gyelposing, Mongar , Bhutan.
Projects Details 2021-2022
Indl. Estate, Kundli
Planning, Design, Engineering, Procurement, Construction, Installation, Testing, Commissioning & trial run for upgradation of existing Common Effluent Treatment Plant of 4 MLD Capacity to 10 MLD Capacity
Gayana Water Inc
Detail Basic Engineering, Design, drawing, preparation of BOQ for Design, Supply
and Installation at Onderneeming, Parika, Parfaite Harmonie, Wales, Caledonia, Bachelor’s Adventure and Cummingslodge
Mongar, Bhutan
Design Engineering, Supervision and Execution of 3.2 MLD Water Treatment Plant for Kanglung Regional Hub, Dzongkhag, Royal Govt. of Bhutan
Samdrup Jongkhar
Detailed-Engineering concept to commissing -ADB funded project of 2.5 MLD WTP, Samdrup Jongkhar, Bhutan.
Search our all projects here >>
| Year | Projects Name | Project Authority | Funding Agency | Cost of Project | Other Remarks |
|---|---|---|---|---|---|
| 2022-23 | Manufacture, Supply, Installation/Erection, Construction and Finishing of 1000 bedded fully self-contained permanent Quarantine Centre at Motanga, Sandrup Jonkhar. | DES, MoWHS, Royal Government of Bhutan | Asian Development Bank. | 1.8 Cr. | Urgent imperative to set up fully self-contained quarantine centers in suitable locations in the country to facilitate the import of foreign workers in line with COVID-19 protocols. |
| 2022-23 | Design, Build, Operate and Transfer (DBOT) Contract for Phangyul Irrigation Scheme, Wangdue Phodrang Dzongkhag. | Department of Agriculture, Ministry of Agriculture and Forests (MoAF), Royal Government of Bhutan | Green Climate Fund (GCF) by RGoB. | 22.93 Cr. | This scheme will significantly benefit Phangyul and Kazhi gewog and will provide assured irrigation water over 1000 acres of wetland in the water scarce gewog. |
| 2022-23 | Engineering, Procurement And Construction (EPC) Work For Construction of Vaghrech Weir, Flood Protection Embankments And Associated Works, Across River Kaveri. | Narmada Water Resources, Water Supply And Kalpasar Department | GoG, Office Of The Superintending Engineer, Surat Irrigation Circle. | 202.42 Cr. | The project envisages construction of gated and ungated weir, across river Kaveri River and Construction of Drainage Network System at both banks of kaveri river near Village Vaghrech of Navsari District 4 km far from Gandevi, Vertical lift type Gates, Bridge, and flood protection embankments across River Kaveri Near Village Vaghrech of Navsari. |
| 2021-22 | Detail Basic Engineering, Design, drawing, preparation of BOQ for Design, Supply and Installation of Water Treatment Plant at Onderneeming, Parika, Parfaite Harmonie, Wales, Caledonia, Bachelor’s Adventure and Cummingslodge | Gayana Water Inc. | Asian Development Bank. | 8 Lakhs | The project design has been done considering water sustainability study at at Onderneeming, Parika, Parfaite Harmonie, Wales, Caledonia, Bachelor’s Adventure and Cummingslodge. |
| 2021-22 | Planning, Design, Engineering, Procurement, Construction, Installation, Testing, Commissioning & trial run (3 months), for upgradation of existing Common Effluent Treatment Plant of 4 MLD Capacity to 10 MLD Capacity | Assistant General Manager (IA)/HSIIDC, Indl. Estate, Kundli.. | Haryana State Industrial & Infrastructure Development Corporation (HSIIDC). | 2216.60 Lacs | The project design has been done for upgradation of Common Effluent Treatment Plant of 4 MLD existing to 10 MLD Capacity, including Operation and Maintenance for 60 months based on Primary, Physico-Chemical, Biological (Extended ASP), Tertiary treatment and allied works on turnkey basis at I.E. Kundli, District - Sonipat (Haryana) |
| 2021-22 | Detailed Engineering design ( including transient analysis) of transmission main, surge vessels and pumping stations including preparation of BOQ of items, estimation works etc. for the project: Construction of Water Supply and Sewerage Systems in Marneuli and Sewerage System and Collector in Bolnisi, Georgia. | Ferro Capital LLC, Gorgia | Detailed Engineering design ( including transient analysis) of transmission main, surge vessels and pumping stations including preparation of BOQ of items, estimation works etc. for the project: Construction of Water Supply and Sewerage Systems in Marneuli and Sewerage System and Collector in Bolnisi, Georgia. | $5000.00 | |
| 2021-22 | Supply of UV 3 Cylinder water filter, 5 taps, Min. of 5 microns, Activated Carbons, 1500 litres LPH, Basin, Stainless Steel and as per Specification | MoWHS, Royal Government of Bhutan, through Kachen Associates Samdrup Jongkhar Bhutan | MoWHS, Royal Government of Bhutan | 43.0 Lacs | The project was implemented for safe and pure drinking water supply to the school children of Bhutan. |
| 2019-20 | Consultancy and Detailed Engineering Services for Construction of ADB funded 2.5 MLD Water Treatment Plant and its Raw water Intake system and Distribution system for the Contractor – Tundi Tacho Construction at Samdrup Jhongkar Thormde, Bhutan. | Samdrup Jhongkar Thormde – Bhutan | Asian Development Bank. | Detailed Engineering Services for Construction of 2.5 MLD WTP and its allied works for the Contractor Tundi Tacho JV. The services also included preparation of Technical documents for selection of Electromechanical vendors, SCADA system vendors including site supervision and implementation works. |
|
| 2017-18 | Preparation of Detailed Project Report for Renovation and Upgradation of Existing Drainage System and Construction of New Effluent Treatment Plant for Balurghat District Hospital, Paschim Dinajpur, West Bengal. | Public Works Department, Government of West Bengal. | Government of India. | Detailed Engineering Services for Construction of 2.5 MLD WTP and its allied works for the Contractor Tundi Tacho JV. The services also included preparation of Technical documents for selection of Electromechanical vendors, SCADA system vendors including site supervision and implementation works. |
|
| 2017- 18 | Detailed Engineering Services for Construction of 1.0 MLD WTP at Gyelposing, Mongar , Bhutan. | Ministry of Works and Human Settlement | Ministry of Works and Human Settlemen | ||
| 2017- 18 | Detailed Engineering Services for Construction of 1.5 MLD WTP at Kadam, Mongar , Bhutan. | Ministry of Works and Human Settlement | Government of India | Had been appointed as Design Engineering Consultant and Project Management Consultant for the Contractor – Chimmi Dew JV |
|
| 2016-2017 | Providing Structural Designing solutions to Water Supply system to M/s Feedback Ventures for DMIDC, Dholera project. | DMIDC, Dholera. | DMIDC, Dhole | ||
| 2016-2017 | Detailed Engineering works for Construction of Faecal Sludge Treatment plant at Savda Gevra, Mundka, New Delhi. | International Water Management Institute, Colom | Bill & Melinda Gates Foundation | The Feacal sludge treatment unit is a unique project in Delhi, where the treatment of the Faecal matters will be treated by processes without the use of power. Further the FSTP area has been so designed that the same will be used as a Park for the local population. |
|
| 2016-2017 | Preparation of Detailed Project Report for upgradation of Water Supply network for Badli Cluster villages – 19 nos under Shyama Prasad Mookherjee RURARBAN Mission. | Public Health Engineering Department – Haryana | Government of India. | The water supply system of the all the villages has been studied and assessed to propose the rehabilitation and upgradation of the system to meet the future demand of year 2048. |
|
| 2016-2017 | Preparation of Detailed Project Report for Bahadurgarh Water Supply scheme for 26 unserved Colony. | Public Health Engineering Department | Govt. of Haryana | Comprehensive study of the existing Water supply system of Bahadurgarh town. Estimation of the present and future demand & upgradation to meet the requirement for the year 2048. |
|
| 2016-2017 | Preparation of Detailed Project Report for Water Distribution system for Bahadurgarh town. | Public Health Department, Haryana | Government of Haryana | A comprehensive assessment of the existing network was done. The colonies which had been unserved by water distribution network has been covered. Rehabilitation and modification of water distribution network to meet the demand of 2048 and terminal pressure upto 15 m was designed. |
|
| 2016-2017 | Preparation of Detailed Project Report Runiyadih Group Water Supply Scheme – Surajpur, Chattisgarh. | Public Health Department, Chattisgarh | Chattisgarh - State Government | Comprehensive Water Sustainability study from Rend river. Design of Water supply system for Group of villages -24 nos. Environmental Impact Analysis and Cost Benefit Analysis of system. |
|
| 2014-2015 | Preparation of Detailed Project Report for Bhilai Municipal Corporation – Phase II | Bhilai Municipal Corporation | Chattisgarh - State Government funding | Comprehensive Water Sustainability study from Shiv nath river. Design of Electromechanical systems and Power supply systems. Environmental Impact Analysis and Cost Benefit Analys |
|
| 2014-2015 | Preparation of Detailed Project Report for Sewerage Network for Simdega Municipal Corporation, Jharkhand | Simdega Nagar Nigam, Jharkhand | State Government funding. Project Cost – Rs 27 Crores. | The Sewerage network has been designed considering the hilly terrain of the area as well as considering the water demand for the year 2046. |
|
| 2007-2008 | Preparation of Detailed Project Report for Rohtak town | Public Health Department, Haryana | State Government funding. | The network design included Water Sustainability study from existing JN canal and Assessment of present capacity of Water Treatment plant. |
|
| 2007-2008 | Preparation of Detailed Project Report for rehabilitation of Old Gurgaon - Gurgaon Municipal Corporation | Public Health Department, Haryana | National Capital Region Planning Board. | ||
| 2007-2008 | Preparation of Detailed Project Report for Sohna town. | Public Health Department, Haryana | Public Health Department, Haryana | The project design has been done considering water sustainability study at Budhera Intake Station, EIA, EMP paramaters and considering the water requirement for NUH Industrial Area. |