Water 360
Water and Wastewater solution provider

आपो हिष्ठा मयोभुवस्था न ऊर्जे दधातन । महे रणाथ चक्षसे ॥१॥

यो वः शिवतमो रसस्तस्य भाजयतेह नः । उशतीरिव मातरः ॥२॥

 

 

O Water, you are refreshing, source of energy, health and piety.

Nourish us with your auspicious sap as mother.

(Rig Veda, Mandala 10, Sukta 9)

Services

Total Service provider from Concept to Commissioning of following Services

Waste Water Treatment Plant

Water Treatment Plant

Water Network modelling

Waste Water and water audit BOQ

Long Distance Piping system design

GIS & Mapping Work

Features

Different projects require different technologies. Pick a plan that matches your current needs.

What we do

water360

Our Clients

Water360 has completed more than 100 projects around the globe since it formed.

water360

Projects

Water 360 provide concepts to commisioning of water supply projects include technical services in analyzing and designing of pipelines for long distance transmission main for Water and Waste Water system

Projects Details 2022-2023

Pasakha,Bhutan

Supply, Erection/Installation, Manufacture & Construction and Finishing of 1200 bedded fully self-contained permanent Quarantine Centre at Pasakha Bhutan.

Matanga, Bhutan

Supply, Erection/Installation, Manufacture & Construction and Finishing of 1000 bedded fully self-contained permanent Quarantine Centre at Matanga,Bhutan.

Motanga,Jonkhar

Supply, Erection/Installation, Manufacture & Construction and Finishing of 1000 bedded fully self-contained permanent Quarantine Centre at Motanga,Sandrup Jonkhar.

River Kaveri

Engineering, Procurement And Construction (EPC) Work For Construction of Vaghrech Weir, Flood Protection Embankments And Assoc Works, Across River Kaveri

Kanglung

Design Engineering, Supervision and Execution of 3.2 MLD Water Treatment Plant for Kanglung Regional Hub, Dzongkhag, Royal Govt. of Bhutan

Gyelposing, Bhutan

Detailed Engineering Services for Construction of 1.0 MLD WTP Water Treatment Plant for at Gyelposing, Mongar , Bhutan.

Projects Details 2021-2022

Indl. Estate, Kundli

Planning, Design, Engineering, Procurement, Construction, Installation, Testing, Commissioning & trial run for upgradation of existing Common Effluent Treatment Plant of 4 MLD Capacity to 10 MLD Capacity

Gayana Water Inc

Detail Basic Engineering, Design, drawing, preparation of BOQ for Design, Supply
and Installation at Onderneeming, Parika, Parfaite Harmonie, Wales, Caledonia, Bachelor’s Adventure and Cummingslodge

Mongar, Bhutan

Design Engineering, Supervision and Execution of 3.2 MLD Water Treatment Plant for Kanglung Regional Hub, Dzongkhag, Royal Govt. of Bhutan

Samdrup Jongkhar

Detailed-Engineering concept to commissing -ADB funded project of 2.5 MLD WTP, Samdrup Jongkhar, Bhutan.

Search our all projects here >>

YearProjects NameProject AuthorityFunding AgencyCost of ProjectOther Remarks
2022-23Manufacture, Supply, Installation/Erection, Construction and Finishing of 1000
bedded fully self-contained permanent Quarantine Centre at Motanga, Sandrup
Jonkhar.
DES, MoWHS, Royal Government of BhutanAsian Development Bank.1.8 Cr.Urgent imperative to set up fully self-contained quarantine centers in suitable
locations in the country to facilitate the import of foreign workers in line with
COVID-19 protocols.
2022-23Design, Build, Operate and Transfer (DBOT) Contract for Phangyul Irrigation
Scheme, Wangdue Phodrang Dzongkhag.
Department of Agriculture, Ministry of Agriculture and Forests (MoAF), Royal
Government of Bhutan
Green Climate Fund (GCF) by RGoB.22.93 Cr.This scheme will significantly benefit Phangyul and Kazhi gewog and will provide
assured irrigation water over 1000 acres of wetland in the water scarce gewog.
2022-23Engineering, Procurement And Construction (EPC) Work For Construction of
Vaghrech Weir, Flood Protection Embankments And Associated Works, Across
River Kaveri.
Narmada Water Resources, Water Supply And Kalpasar DepartmentGoG, Office Of The Superintending Engineer, Surat Irrigation Circle.202.42 Cr.The project envisages construction of gated and ungated weir, across river Kaveri
River and Construction of Drainage Network System at both banks of kaveri river
near Village Vaghrech of Navsari District 4 km far from Gandevi, Vertical lift type
Gates, Bridge, and flood protection embankments across River Kaveri Near Village
Vaghrech of Navsari.
2021-22Detail Basic Engineering, Design, drawing, preparation of BOQ for Design, Supply
and Installation of Water Treatment Plant at Onderneeming, Parika, Parfaite
Harmonie, Wales, Caledonia, Bachelor’s Adventure and Cummingslodge
Gayana Water Inc.Asian Development Bank.8 LakhsThe project design has been done considering water sustainability study at
at Onderneeming, Parika, Parfaite Harmonie, Wales, Caledonia, Bachelor’s
Adventure and Cummingslodge.
2021-22Planning, Design, Engineering, Procurement, Construction, Installation, Testing,
Commissioning & trial run (3 months), for upgradation of existing
Common Effluent Treatment Plant of 4 MLD Capacity to 10 MLD Capacity
Assistant General Manager (IA)/HSIIDC, Indl. Estate, Kundli..Haryana State Industrial & Infrastructure Development Corporation (HSIIDC).2216.60 LacsThe project design has been done for upgradation of Common Effluent Treatment
Plant of 4 MLD existing to 10 MLD Capacity, including Operation and Maintenance
for 60 months based on Primary, Physico-Chemical, Biological (Extended ASP),
Tertiary treatment and allied works on turnkey basis at I.E. Kundli, District - Sonipat
(Haryana)
2021-22Detailed Engineering design ( including transient analysis) of
transmission main, surge vessels and pumping stations including preparation
of BOQ of items, estimation works etc. for the project: Construction of Water
Supply and Sewerage Systems in Marneuli and Sewerage System and
Collector in Bolnisi, Georgia.
Ferro Capital LLC, GorgiaDetailed Engineering design ( including transient analysis) of
transmission main, surge vessels and pumping stations including preparation
of BOQ of items, estimation works etc. for the project: Construction of Water
Supply and Sewerage Systems in Marneuli and Sewerage System and
Collector in Bolnisi, Georgia.
$5000.00
2021-22Supply of UV 3 Cylinder water filter, 5 taps, Min. of 5 microns, Activated Carbons,
1500 litres LPH, Basin, Stainless Steel and as per Specification
MoWHS, Royal Government of Bhutan, through Kachen Associates
Samdrup Jongkhar Bhutan
MoWHS, Royal Government of Bhutan43.0 LacsThe project was implemented for safe and pure drinking water supply to the school
children of Bhutan.
2019-20Consultancy and Detailed Engineering Services for Construction of ADB funded
2.5 MLD Water Treatment Plant and its Raw water Intake system and
Distribution system for the Contractor – Tundi
Tacho Construction at Samdrup Jhongkar Thormde, Bhutan.
Samdrup Jhongkar Thormde – BhutanAsian Development Bank.Detailed Engineering Services for Construction of 2.5 MLD WTP and its allied
works for the Contractor Tundi Tacho JV. The services also included preparation
of Technical documents for selection of
Electromechanical vendors, SCADA system vendors including site supervision and
implementation works.
2017-18Preparation of Detailed Project Report for Renovation and Upgradation of
Existing Drainage System and Construction of New Effluent Treatment
Plant for Balurghat District Hospital, Paschim Dinajpur, West Bengal.
Public Works Department, Government of West Bengal.Government of India.Detailed Engineering Services for Construction of 2.5 MLD WTP and its allied
works for the Contractor Tundi Tacho JV. The services also included preparation
of Technical documents for selection of
Electromechanical vendors, SCADA system vendors including site supervision and
implementation works.
2017- 18Detailed Engineering Services for Construction of 1.0 MLD WTP at Gyelposing, Mongar
, Bhutan.
Ministry of Works and Human SettlementMinistry of Works and Human Settlemen
2017- 18Detailed Engineering Services for Construction of 1.5 MLD WTP at Kadam, Mongar ,
Bhutan.
Ministry of Works and Human SettlementGovernment of IndiaHad been appointed as Design Engineering Consultant and Project
Management Consultant for the Contractor – Chimmi Dew JV
2016-2017Providing Structural Designing solutions to Water Supply system to
M/s Feedback Ventures for DMIDC, Dholera project.
DMIDC, Dholera.DMIDC, Dhole
2016-2017Detailed Engineering works for Construction of Faecal Sludge
Treatment plant at Savda Gevra, Mundka, New Delhi.
International Water Management Institute, ColomBill & Melinda Gates FoundationThe Feacal sludge treatment unit is a unique project in Delhi, where the
treatment of the Faecal matters will be treated by processes without the use
of power. Further the FSTP area has been so designed that the same will be
used as a Park for the local population.
2016-2017Preparation of Detailed Project Report for upgradation of Water Supply
network for Badli Cluster villages – 19 nos under Shyama
Prasad Mookherjee RURARBAN Mission.
Public Health Engineering Department – Haryana
Government of India. The water supply system of the all the villages has been studied and
assessed to propose the rehabilitation and upgradation of the system
to meet the future demand of year 2048.
2016-2017Preparation of Detailed Project Report for Bahadurgarh Water Supply
scheme for 26 unserved Colony.
Public Health Engineering DepartmentGovt. of HaryanaComprehensive study of the existing Water supply system of
Bahadurgarh town. Estimation of the present and future demand &
upgradation to meet the requirement for the year 2048.
2016-2017Preparation of Detailed Project Report for Water Distribution system
for Bahadurgarh town.
Public Health Department, HaryanaGovernment of HaryanaA comprehensive assessment of the existing network was done. The
colonies which had been unserved by water distribution network has
been covered. Rehabilitation and modification of water distribution
network to meet the demand of 2048 and terminal pressure upto 15 m
was designed.
2016-2017Preparation of Detailed Project Report Runiyadih Group Water
Supply Scheme – Surajpur, Chattisgarh.
Public Health Department, ChattisgarhChattisgarh - State GovernmentComprehensive Water Sustainability study from Rend river. Design
of Water supply system for Group of villages -24 nos. Environmental
Impact Analysis and Cost Benefit Analysis of system.
2014-2015Preparation of Detailed Project Report for Bhilai Municipal
Corporation – Phase II
Bhilai Municipal CorporationChattisgarh - State Government fundingComprehensive Water Sustainability study from Shiv nath river.
Design of Electromechanical systems and Power supply systems.
Environmental Impact Analysis and Cost Benefit Analys
2014-2015Preparation of Detailed Project Report for Sewerage Network for
Simdega Municipal Corporation, Jharkhand
Simdega Nagar Nigam, JharkhandState Government funding. Project Cost – Rs 27 Crores.The Sewerage network has been designed considering the hilly
terrain of the area as well as considering the water demand for the
year 2046.
2007-2008Preparation of Detailed Project Report for Rohtak townPublic Health Department, HaryanaState Government funding.The network design included Water Sustainability study from
existing JN canal and Assessment of present capacity of Water
Treatment plant.
2007-2008Preparation of Detailed Project Report for rehabilitation of Old
Gurgaon - Gurgaon Municipal Corporation
Public Health Department, HaryanaNational Capital Region Planning Board.
2007-2008Preparation of Detailed Project Report for Sohna town.Public Health Department, HaryanaPublic Health Department, HaryanaThe project design has been done considering water sustainability study at
Budhera Intake Station, EIA, EMP paramaters and considering the water
requirement for NUH Industrial Area.